Bound variable

精品项目网 2024-05-18 11:34:48

基本释义:

约束变项

网络释义

1)Bound variable,约束变项

2)item constraint,项约束

3)item constraints,项目约束

4)binding term,约束项

5)item constraints,数据项约束

6)distance resistance function,距离约束项

用法和例句

The Eclat algorithm is used as the prototype for discussion of the problem of association rule mining with item constraints.

以 Ecalt算法为原型 ,讨论了如何将项目约束引入关联规则挖掘过程的问题 ,从理论上证明了引入约束后的 Eclat+算法可以大大提高算法的效率和速度 ,并对相关的算法进行了比较 。

This paper defines first two kinds of binding terms of different quality,that is binding term of "no possibility of appearing" and "having arbitrary quality".

定义了两种不同性质的约束项,即“不会出现的”约束项和“具任意性”的约束项,并以一个同步五进制加法计数器为例,说明了分别应用这两种最小项以不同的方式设计电路,使所设计的数字电路最简单。

Mining sequential patterns with item constraints;

带数据项约束的序列模式挖掘

On the Association Rules of Mining Algorithm Containing Item Constraint;

基于项目约束的关联规则挖掘方法的研究

Fuzzy Multiobjects Constrained Investment Projects Selection Modeling;

模糊多目标有约束投资项目选择建模

Application of Theory of Constraint on Project Management for Implement ERP System;

约束理论在ERP项目管理中的运用

Discussion on the Mesures to Restrict the Venture of Commonweal Constrcut Item;

公益性建设项目的风险约束机制研究

Take Precaution Against Moral Risk of Project:Education and Restriction;

工程项目的道德风险防范:约束与教育

Max-npv project scheduling problems with cash flow balance constraints

现金流平衡约束下的Max-npv项目调度

Ternary Restrictions of Project Management and Its Application in Mechanical and Electrical Installation Project in Tianlong Lake Hydropower Station;

项目管理三重约束及其在天龙湖电站机电安装项目的应用

Project Schedule Planning Research Base on Resource Conflict in Xi an Police Mobile System;

资源约束下的项目进度计划管理—移动警务信息系统的项目实践

Resource-Constraint Multi-Enterprise Resource Allocation and Project Scheduling Algorithm;

资源约束跨企业项目资源平衡与调度优化算法

Research and Implementation of an Algorithms for Mining Constrained Maximum Frequent Itemsets;

基于约束的最大频繁项目集挖掘算法与实现

Research on Project Scheduling with Uncertain Resource Constraint;

不确定资源约束下的项目调度问题研究

The Study on Incentive and Constraint Mechanism of Construction Corporation Manager in Our Country;

我国施工企业项目经理激励约束机制研究

A Study on Incentive and Restraint Mechanisms of Agent Construction in Government Invested Projects;

政府投资项目代建制的激励约束机制研究

Scheduling Resource-constrained Project with Critical Chain Management;

关键链法解决资源约束下的项目流程问题

Chance constrained programming models for optimization of project schemes;

面向项目方案优化的机会约束规划模型

Optimization scheduling research of multi-resource-constrained project based on mixed-intelligence algorithm;

基于混合智能算法的多资源约束项目优化调度

A Modified Genetic Algorithm for Scheduling Multiple Projects with Resource Constraint;

资源约束下多项目调度的改进遗传算法

Research on Resource-Constrained Project Scheduling Problem with Generalized Precedence Relations;

带广义紧前约束的资源受限项目计划问题求解

下一篇:没有了
上一篇:motion detector
精彩图文
相关推荐
  1. bound variable

    精品项目网为您提供约束变词bound variable是什么意思,bound variable翻译,bound variable例句,bound variable用法等有关,bound variable单词知识大全供您查询使用!...

    0 条评论 59 2024-05-16 22:49

  2. trauzl's lead block test

    精品项目网为您提供特劳茨尔试验trauzl's lead block test是什么意思,trauzl's lead block test翻译,trauzl's lead block test例句,trauzl's lead block test用法等有关,trauzl's lead block test单词知识大全供您查询使用!...

    0 条评论 59 2024-05-17 08:31

  3. early infantile autism

    精品项目网为您提供早期幼儿自闭症early infantile autism是什么意思,early infantile autism翻译,early infantile autism例句,early infantile autism用法等有关,early infantile autism单词知识大全供您查询使用!...

    0 条评论 59 2024-05-18 11:32

返回顶部小火箭