Pre Planned Product Improvement

精品项目网 2024-05-19 20:14:04

基本释义:

先行计划产品改进

网络释义

1)Pre Planned Product Improvement,先行计划产品改进

2)Pre-planned product improvement(P 3I),预先计划的产品改进

3)PIP (Product Improvement Program),产品改进计划

4)P~3I (Pre-Planned Product Improvement),预先计划的产品改进(P~3I)

5)Advanced production planning,先进生产计划

6)advanced planning & scheduling,先进计划与排产

用法和例句

The meanings and theoretical base of advanced planning & scheduling(APS) and the necessity of developing advanced planning & scheduling system in aluminum foil enterprise are discussed in the article.

探讨了先进计划与排产的含义和理论基础,探讨了在铝箔企业开发先进计划与排产系统的必要性。

Research on advanced production planning and real-time scheduling for iron and steel enterprises;

钢铁企业先进生产计划和实时生产调度技术的研究

a production schedule

生产进度[计划]表

Discuss on Developing Advanced Planning & Scheduling System in Aluminum Foil Plant;

铝箔生产厂开发先进计划与排产系统的探讨

To Ensure Advancement of Cable Production Base for Export

精心规划设计 确保出口线缆生产基地的先进性

To Ensure Advancement of Cable Production Base for Export;

精心规划设计 确保出口线缆生产基地的先进性

productivity enhancement services programme

生产力促进服务计划

This problem is planned to solve with further R & D in trial operation.

对此,计划在先导性生产应用中进一步研发加以解决。

Be responsible for implementing and monitoring the production plan to ensure timely completion with good quality.

负责对生产计划进行实施与监控,确保生产计划按时保质的完成。

Safe Motherhood and Better Health for Family Planning Conference

安全孕产和增进健康计划生育会议

Software Process Improvement Programme [Hong Kong Productivity Council]

软件程序改善计划〔香港生产力促进局〕

Software Quality Improvement Programme [Hong Kong Productivity Council]

软件品质改良计划〔香港生产力促进局〕

Dalian Sanyo Cold Chain Ltd Flow Improvement of Production Plan Disquisition;

大连三洋冷链生产计划流程改进研究

Study On Dispatching Rules Algorithm for Rescheduling;

生产作业计划调整的优先调度算法研究

planned throughput

计划生产量(生产能力)

Mr. Zhang Ping and Mr. Zhu Xiaodong.

张平先生和朱晓东先生讨论培训计划。

product-pay-back scheme

以生产产品偿还的计划

Acquisition of the F/A-18 Radar Upgrade Program; Audit rept

F/A-8型雷达改进计划的产生过程/审查报告

A control plan for ongoing production verification is required.

对正在进行的生产确认需要一个控制计划。

下一篇:没有了
上一篇:bl 34
精彩图文
相关推荐
  1. deoxyketo-steroid (DKS)

    精品项目网为您提供脱氧酮类醇deoxyketo-steroid (DKS)是什么意思,deoxyketo-steroid (DKS)翻译,deoxyketo-steroid (DKS)例句,deoxyketo-steroid (DKS)用法等有关,deoxyketo-steroid (DKS)单词知识大全供您查询使用!...

    0 条评论 59 2024-05-19 16:58

  2. tannin extract

    精品项目网为您提供丹宁提取物tannin extract是什么意思,tannin extract翻译,tannin extract例句,tannin extract用法等有关,tannin extract单词知识大全供您查询使用!...

    0 条评论 59 2024-05-17 03:26

返回顶部小火箭