project objective

精品项目网 2024-05-19 21:34:19

基本释义:

项目目标

网络释义

1)project objective,项目目标

2)project goal,项目目标

3)project object,项目目标

4)multi-objective hydropower projects,多目标项目

5)project object method,项目目标法

6)transnormal items,超标项目

用法和例句

The Quantitative Analysis of Project Objective Flexible Control Based on Double Base Points;

基于双基点法的项目目标柔性控制的定量分析

Only having an integrated plan and measurement of objective,the realization of project objective can be successfully achieved.

建设项目目标三角中,各目标是相互联系的,目标的规划和目标实施绩效的评估是目标控制的重要内容,只有对各目标进行集成的规划,并在实施过程中对其实施绩效进行评估,才能保证项目目标的实现。

The project goal is controlled within the plan made before hand together with the effective means.

建设工程项目目标的控制是贯穿项目的整个建设过程。

To deal with the lack of effective project management in corporation,this paper puts forward new e- valuation concept,based on enterprise resource planning(ERP)project management theory,which is to evalu- ate the performance of ERP project by checking the achievement of project object.

针对制造企业缺乏有效的项目管理导致项目失败的问题,提出了以ERP项目管理理论为基础,从项目目标实现程度角度评价ERP项目的实施效果的观点。

In order to ensure the project object completing,the control capacity of the major engineer for the project object is very important?The article analyzes the major engineer s responsibility, combines with engineering supervise practice and experience, putting forward the suggestions about how to improve the control capacity for the project object.

随着中国加入WTO和建筑市场的越加规范 ,项目总监理工程师已成为项目管理的核心 ,为保证项目目标的实现 ,总监理工程师对项目目标控制的预见能力尤为重要。

Applying group decision theory and the optimization theory will be mainly analysed,after other methods for multi-objective hydropower projects examined.

多目标项目费用分摊,是项目投资的难点和薄弱环节。

The Influence of Schedule Target on Project Performance;

项目目标进度的设定对项目表现的影响(英文)

Performing the owner’s duty for the engineering project, fulfilling project target;

认真履行工程项目业主的职责,实现项目目标

Set up active plan according to project target and schedule.

根据项目目标及进度制定行动计划.

Project Goals (double-click on square handles to expand list)

项目目标 (双击方块控点展开列表)

Cannot upgrade project. Destination directory %1 is not empty.

无法升级项目。目标目录 %1 不是空的。

Download only headers for items larger than

仅下载项目标题,当项目大小大于

Brief Introduction of Bidding for Engineering Project (first part);

浅谈工程项目的招标与投标(上)——工程项目的招标

Performance Evaluation of ERP Implementation Based on the Project Management Theory;

基于工程项目管理理论的ERP项目实施目标评价

On Social Goals and Social Effects Evaluation for Projects

论项目的社会目标与项目社会影响评估

He ticked off the items one by one.

他把这些项目逐一标出。

d nonstandard items

特殊的与非标准的项目

He ticked off some items on the list.

他在表上标出几个项目。

within-dimension targets

学习范畴的分项目标

Disaster Terminology Standardization Project

灾害名词标准化项目

The current selection is not an allowed target.

当前选定的项目不能作为目标文件夹。

Select a folder where you want to copy the selected items.

请选择复制选定项目的目标文件夹。

Mission of Stardust, goals, scientific contribution, etc.

星尘项目的使命,目标、学贡献及其他。

The goal and contents of establishing the project

本项目建设的目标和内容

下一篇:没有了
上一篇:rubber finger
精彩图文
相关推荐
  1. free variant

    精品项目网为您提供自由变体free variant是什么意思,free variant翻译,free variant例句,free variant用法等有关,free variant单词知识大全供您查询使用!...

    0 条评论 59 2024-05-18 14:33

  2. training product in early stag

    精品项目网为您提供早期训练计划training product in early stage是什么意思,training product in early stage翻译,training product in early stage例句,training product in early stage用法等有关,training product in early stage单词知识大全供您查询使...

    0 条评论 59 2024-05-18 11:58

返回顶部小火箭