基本释义:

项目主进度计划

网络释义

1)Master Project Schedule,项目主进度计划

2)Project scheduling,项目进度计划

3)Project Schedule,项目进度计划

4)Program Schedule and Plan,项目进度与计划

5)project scheduler,项目进度计划师

6)project scheduling technology,项目进度计划技术

用法和例句

Critical chain method: A new project scheduling approach;

关键链法:一种新型的项目进度计划方法

In project scheduling, the activity precedence constraint was transformed into a relation matrix.

在项目进度计划中,将工序的前后约束关系变换成一个关联矩阵,从可执行的工序集合中随机产生初始化种群,采用改进型的双点交叉算子,并提出了基于关系矩阵的邻位变异算子,避免了不可行个体的产生。

This paper illustrates the goal and significance of identifying critical chain in project scheduling,and analyzes the drawbacks introduced by the conventional project scheduling methods.

本文阐述了项目进度计划中,确定关键链的目的及意义,深入分析了传统项目计划方法存在的问题。

The arrangement of the Project Schedule and allocation of the project staffing play a very important role in the PM.

项目进度计划的安排和项目人员的设置在项目管理中起着非常重要的作用。

A Technology Based on Critical Chain for Project Scheduling;

一种基于关键链的项目进度计划方法

Study on the Method of Data Warehouse Project Schedule Development;

数据仓库项目进度计划编制方法研究

IT Project Planning Based on Multiple-phase Optimization;

基于分阶段求优的IT项目进度计划方法

Progress of Project Based on Colored Petri Nets

基于着色Petri网的项目进度计划

Research on Planning and Schedule Control of CSPC Nannai Petrochemicals Construction Project;

南海石化汽电联产项目进度计划与控制研究

The Construction Schedule and Control of the Sinopec Guangzhou Refinery Revamp Project;

广州石化炼油改扩建项目进度计划与控制

Research of Schedule Plan and Schedule Control of Fire System of Jingshui Building;

晶水大厦消防工程项目进度计划与控制研究

IT Project Planning Method Based on Markov Decision Process;

基于马尔可夫决策过程的IT项目进度计划方法

Schedule Plan and Schedule Control of JD Smart Card Applying System;

JD校园一卡通工程(一期)项目进度计划与控制

Study on the Plan and Control of Multi-projects Schedule Based on Critical Chain Method;

基于关键链技术的多项目进度计划与控制研究

Research of Schedule Plan and Schedule Control of Maintaining Project of Qintglonchang Flyover;

青龙场立交桥维修工程项目进度计划与控制

Set up active plan according to project target and schedule.

根据项目目标及进度制定行动计划.

Plan and Control of Schedule in Telecommunication Design Project

通信工程设计项目的进度计划与控制

(13) the progress plan for the construction of the project; and

(十三)项目实施的进度计划;

A Research on Schedule Plan and Control of Software Development Project;

软件开发项目的进度计划与控制研究

618B04 Fetal Monitor Project Schedule Management Plan Study

618B04胎儿监护仪项目进度管理计划研究

Use the relevant background information to put together a project charter.

运用相关背景资料编制项目实施进度计划表.

Coordinate programs including planning, scheduling, ordering, and tracking.

项目协调,包括制定计划,进度安排,分类及跟踪。

下一篇:没有了
上一篇:trolley
精彩图文
相关推荐
  1. pseudoparaphysis

    精品项目网为您提供拟侧丝pseudoparaphysis是什么意思,pseudoparaphysis翻译,pseudoparaphysis例句,pseudoparaphysis用法等有关,pseudoparaphysis单词知识大全供您查询使用!...

    0 条评论 59 2024-05-18 20:38

  2. indivisible

    精品项目网为您提供不能除尽[的]indivisible是什么意思,indivisible翻译,indivisible例句,indivisible用法等有关,indivisible单词知识大全供您查询使用!...

    0 条评论 59 2024-05-16 18:39

返回顶部小火箭