stub guy

精品项目网 2024-05-20 13:52:00

基本释义:

有拉桩的拉线

网络释义

1)stub guy,有拉桩的拉线

2)anchor rod,拉线桩,锚桩

3)wire anchor,拉线桩

4)stay rod,撑杆,拉线桩

5)anchor,land tie,拉桩

6)brake anchor,制动器拉桩[线]

用法和例句

Study on Anchorage Pile in Baiyangou Landslide

锚拉桩在三峡库区白岩沟西滑坡治理中的应用

A Design of Anchor Piles Brace Structures for Soft Soil Foundation Pits

浅析软土基坑支护中的锚拉桩结构设计

Control technology of initial tension of pull rod in sheet-piled wharf construction

板桩码头施工中拉杆初始张拉力的控制

Study on Interaction of Soil and Structure of Sheet-pile Bulkhead with Raked Piles;

斜拉板桩码头结构与土相互作用研究

Water Blocking Cofferdam Construction Technology by Using Larssen Sheet Piles with Small Seam Allowance

小止口拉森钢板桩阻水围堰施工工艺

Construction technology of slope retaining wall and cable-anchored anti-slide pile

边坡挡土墙与锚拉式抗滑桩施工技术

Take a turn round that stump with the bight of it! Stand by that stage, now -- let her go!

把绳头靠船桩绕住好,就这么拉紧——放手吧!

The cast the load of that marriage on Lord Clarendeon.

他们把那桩婚姻的过错归咎于克拉伦顿勋爵。

2-D Finite Element Analysis of Prestressed Anchorage Sheet-Pile Wall

预应力锚拉式桩板墙的二维有限元计算

Measuring and Analyzing Tension Force of Anchor Cable in Anti-slide Pile with Pre-stressed Anchor Cable

预应力锚索抗滑桩工程中锚索拉力实测与分析

The Solution of Elasticity Theory with Different Modulus in Tension and Compression and Settlement Calculation of Piles;

拉压模量不同弹性理论解及桩基沉降计算

Mechanics Analysis of Tendon Anti-slide Pile with Finite Element Method;

预应力锚拉抗滑桩受力特性有限元分析

Design and Utilization of Lasson Pile Supports and Protections Technology in Hole Excavated for Building Foundation Supports and Protections;

拉森桩支护技术在基坑支护中的设计和应用

The anchoring tension influences on piles in row structure deformation and mechanical characteristics

锚拉力对排桩支护结构变形和受力特性的影响

Discussion on Tensile Force of Piles Caused by Subsoil Rebound in Soft Soil Area

上海软土地区深基坑回弹引起桩拉力的探讨

Calculation for Construction of Larssen VI Steel Sheet Pile Cofferdam in Strong Tidal Bore Area

强涌潮地区拉森Ⅵ型钢板桩围堰施工计算

Batch Prestress Loss of Concrete Pipe Pile by Post-Tensioning Method

后张预应力混凝土管桩分批张拉预应力损失

Studies of relation between drag load and time of negative skin friction of pile foundation

桩基负摩擦力的下拉荷载与时间关系研究

下一篇:没有了
上一篇:stacked strip conductor
精彩图文
相关推荐
  1. NaNO_2

    精品项目网为您提供亚硝酸钠NaNO_2是什么意思,NaNO_2翻译,NaNO_2例句,NaNO_2用法等有关,NaNO_2单词知识大全供您查询使用!...

    0 条评论 59 2024-05-17 09:40

  2. illumination ergonomics

    精品项目网为您提供照明工效学illumination ergonomics是什么意思,illumination ergonomics翻译,illumination ergonomics例句,illumination ergonomics用法等有关,illumination ergonomics单词知识大全供您查询使用!...

    0 条评论 59 2024-05-18 12:22

返回顶部小火箭