TDR Time of Day Routing

精品项目网 2024-05-21 22:02:09

基本释义:

日期路由选择

网络释义

1)TDR Time of Day Routing,日期路由选择

2)choose a date,选择日期

3)routing selection,路由选择

4)routing

['ru:ti?],路由选择

5)route selection,路由选择

6)route selecting,路由选择

用法和例句

Multi-constrained QoS routing selection based on niche immune algorithm

基于小生境免疫算法的多约束QoS路由选择

Though considering about dynamic routing selection and proportional fair scheduling jointly,the network can get the multi-user persity gain and routing selection gain.

本文提出了一种路由选择和比例公平性联合调度算法。

A QoS-based routing algorithm;

一种基于QoS的路由选择算法

Improved quantum genetic algorithm for routing problem;

求解路由选择问题的改进量子遗传算法

Realization and simulation of heuristic algorithm in QoS routing;

启发式QoS路由选择算法的实现与仿真

Optimizations of route selection and capacity and flow assignments in computer networks;

计算机网络中路由选择的优化研究

Study on optimizations for route selection and capacity and flow assignment in networks based on improved particle swarm optimization algorithm;

基于改进粒子群算法的网络路由选择和CFA的优化研究

Mobile ip Route Selection Based on Hybrid Genetic Algorithm;

基于混合遗传算法的移动ip路由选择

Click a repeat pattern, and then select dates (if needed).

请选中某个单选框,然后根据需要选择日期(如果需要)。

Resetting the data and time

日期和时间的重新选择

The set of seleced dates for use when range selection is enabled.

当启用范围选择时使用的选定日期集。

No recurring scheduler is selected, please select daily, monthly or weekly.

未选择定期计划程序,请选择每日、每月或每周。

No recurring schedule has been selected. Please select daily, monthly or weekly.

未选择定期计划。请选择每日、每月或每周。

Date imprinting can be pided into five types: date, time, and no imprinting.

日期选择可分成5种类型:日期、时间和没有影印

You have chosen an invalid date range. Make sure that the "Before" date is earlier than the "After" date.

选择的日期范围无效,请确认“从”框中的日期在“到”框中的日期之前。

Set the time and date, then select Next.

设置日期和时间,然后选择“下一步”。

Select to display the time with the dates

选择此项可使显示的时间带有日期

Select a different time or different days to backup the server.

选择不同的时间或日期来备份服务器。

The maximum date that can be selected for a month calendar control.

可以为月历控件选择的最大日期。

You must select at least one day on which you want the appointment to recur.

您必须为约会选择至少一个重复日期。

Let her delay her choice as she desires.

照她希望的那样,推迟选择的日期吧。

Select the time and day you want this task to start

请选择任务运行的起始时间和日期

Select the project in which to update the calendar exception:

请选择要在其中更新日历例外日期的项目:

Free/Busy information cannot be found for the date you have choosen. Please select a different date.

无法找到您所选日期的忙/闲信息。请重新选择。

Select the status report start and end dates that you want to filter on.

请选择要筛选出的状态报告的开始和结束日期。

Bolded dates in Date Navigator represent days containing items

在“日期选择区”中加粗显示的日期代表其包含项目

下一篇:没有了
上一篇:GATD Graphic Analysis of Three C Dimensional Data
精彩图文
相关推荐
  1. pebble mill

    精品项目网为您提供砾磨机pebble mill是什么意思,pebble mill翻译,pebble mill例句,pebble mill用法等有关,pebble mill单词知识大全供您查询使用!...

    0 条评论 59 2024-05-17 06:28

  2. drive shaft speed

    精品项目网为您提供主动轴转速drive shaft speed是什么意思,drive shaft speed翻译,drive shaft speed例句,drive shaft speed用法等有关,drive shaft speed单词知识大全供您查询使用!...

    0 条评论 59 2024-05-21 17:07

返回顶部小火箭