Expert Program

精品项目网 2024-05-22 09:47:51

基本释义:

项目程序

网络释义

1)Expert Program,项目程序

2)operational procedures of project,项目实施程序

3)project librarian,项目库管理程序

4)exe Project,可程序文件项目

5)procedures for project revisions,项目修订程序

6)project priority order,项目排序

用法和例句

Proceeding project priority order of trunk road is to make use of funds and make the transportation condition get the best amelioration, so the function of the progromming project can be exerted really.

进行城市干道网项目排序是为了合理利用建设资金使交通运行状况得到最大改善,真正发挥规划方案的作用。

In according to the characteristics of small and medium-sized city road network,the thesis brings forward a whole practical method of planning,which includes forecasting of traffic demand,network programming design method, evaluation indexes and methods of scheme,and project priority order.

在最后的建设项目排序过程中,提出了先采用综合定量比较法确定各个规划期的建设项目,然后应用以干道路网总运行时间为目标的投资优化模型确定近期的干道建设项目,最后结合建设资金和支路建设项目综合考虑确定近期项目排序。

Strengthening Project Program Management,Improving Highway Construction Quality

加强项目程序管理 提升公路建设质量

The Design and the Realization for the Network Course of Program Design Language Based on Project;

基于项目程序设计语言的网络课程设计和实现

Programming/Project Development Unit

程序设计/项目开发股

This program group already contains the maximum number of items.

该程序组已包括最大数目的项目。

On the Program of Tender and Tender Offering for International Contracted Project

谈国际工程承包项目的招标投标程序

Study of Tendering and Bidding Procedures of Engineering Construction Projects;

工程建设项目招投标程序的实证研究

Operating Sequence of Project Completion and Settlement for General Contracting Project

工程总承包项目竣工、结算操作程序

Importance of programming for dairy project construction and general procedure;

乳品项目建设程序化的重要性和一般程序

We should simplify examination and approval procedures for foreign-funded projects that involve high and new technologies and transferred technology.

对高新技术项目和转让技术项目,简化外商投资项目的审批程序。

Reference to assembly {0} was added to the project

对程序集 {0} 的引用已被添加到项目中

"An application is creating a Protected item.

"应用程序正在创建受保护的项目。

An application is requesting access to a Protected item.

应用程序正在请求访问受保护的项目。

Setup was unable to remove the item '%1' from the '%2' collection.

安装程序无法从 '%2' 集合中删除项目 '%1'。

Setup was unable to get item %1 from the '%2' collection.

安装程序无法从 '%2' 集合中获得项目 %1。

Considerations about the Operational Procedures of the Development Projects in Two Areas(Shanxi s Old Revolutionary Base Areas Including Northwestern Area and Taihang Mountain Area);

对山西“两区”开发项目实施程序的思考

Practical project for basic Java programming;

Java语言程序设计基础实训项目之我见

Procedure and Key Point of HSE Management on Construction for Engineering Project Contracting;

总承包项目的HSE管理程序及管理要点

Optimum Sequential Decision-making Method Applied on the Evaluation of Project;

优序法决策在工程项目评价中的应用

下一篇:没有了
上一篇:vector descriptor
精彩图文
相关推荐
  1. narcissistic neurosis

    精品项目网为您提供自恋神经症narcissistic neurosis是什么意思,narcissistic neurosis翻译,narcissistic neurosis例句,narcissistic neurosis用法等有关,narcissistic neurosis单词知识大全供您查询使用!...

    0 条评论 59 2024-05-18 13:39

  2. gastric pit (gastric juice)

    精品项目网为您提供胃小凹(胃液)gastric pit (gastric juice)是什么意思,gastric pit (gastric juice)翻译,gastric pit (gastric juice)例句,gastric pit (gastric juice)用法等有关,gastric pit (gastric juice)单词知识大全供您查询使用!...

    0 条评论 59 2024-05-19 18:32

返回顶部小火箭