formed finish

精品项目网 2024-05-22 19:30:14

基本释义:

开拓完成,辟拓完成

网络释义

1)formed finish,开拓完成;辟拓完成

2)Finish to Start,完成开始

3)Start to Finish,开始-完成

4)full topology,完全拓扑

5)Finish to Finish,完成完成

6)quasi complete topology,拟完备拓扑

用法和例句

In the case of Intelligent Transportation System (ITS), a full topology is defined in Geographical Data Files 4.

0的要求和道路网拓扑关系的特点,研究了一种道路网完全拓扑关系的生成算法,即根据点的几何坐标生成结点—边拓扑关系的算法,以及从标识点出发利用Qi算子生成部分非传统面拓扑关系的算法。

In PDM, finish-to-start is the most commonly used type of logical relationship.

开始-完成-紧前工序必须在紧后工序完成前开始.

The Timeline finish date must be later than the start date.

时间线完成日期必须在开始日期之后。

in for a penny,in for a pound(saying)having started to do sth,it is worth spending as much time or money as is necessary to complete it

(谚)既已开始, 应该完成;一不做,二不休.

Do not start another operation until current one has finished.

完成当前的操作之前不要开始另一个。

Start date cannot be set later than the Finish date.

开始日期不能设置为晚于完成日期

Not finished nor yet begun.

不要说完成甚至于还没有开始。

aspect without regard to the beginning or completion of the action of the verb.

不考虑动词发出的动作的开始和完成。

the beginning or duration or completion or repetition of the action of a verb.

动词行为的开始或持续或完成或重复。

Either enumeration has not started or has already finished.

枚举尚未开始,或者枚举已经完成。

Show tasks that start or finish after:

显示在此日期后开始或完成的任务:

Will he finished what he begins?

他已把开始阶段完成了吗?

2. (a) The work programme shall be initiated as soon after the entry into force of the WTO Agreement as possible and will be completed within three years of initiation.

2. (a) 工作计划应在《WTO协定》生效后尽早开始,并在开始后3年内完成。

The work programme shall be initiated as soon after the entry into force of the WTO Agreement as possible and will be completed within three years of initiation.

工作计划应在《WTO协定》生效后尽早开始,并在开始后3年内完成。

Please enter a valid Interval start date (within the Timeline start and finish dates).

请输入有效的间隔开始日期(在时间线开始日期和完成日期范围内)。

Please enter a valid Interval finshi date (within the Timeline start and finish dates).

请输入有效的间隔完成日期(在时间线开始日期和完成日期范围内)。

Adds a text box containing task name, scheduled start, scheduled finish, actual start and actual finish.

添加包含任务名称、预定开始、预定完成、实际开始和实际完成的文本框。

The end date or time is set to occur before the start date or time. Please change either the start date and time or the end date and time.

完成日期或时间应该发生在开始日期或时间之前,请修改完成日期和时间或开始日期和时间。

Adds a text box containing task name, early start, duration, early finish, late start, slack and late finish.

添加包含任务名称、提前开始、持续时间、提早完成、推迟开始、淡季和推迟完成的文本框。

下一篇:没有了
上一篇:survey and repair cycle
精彩图文
相关推荐
  1. paleotopography

    精品项目网为您提供古地形paleotopography是什么意思,paleotopography翻译,paleotopography例句,paleotopography用法等有关,paleotopography单词知识大全供您查询使用!...

    0 条评论 59 2024-05-17 13:31

  2. hold circuit, lock-in circuit

    精品项目网为您提供自保电路hold circuit, lock-in circuit,stick circuit, self-holding circuit是什么意思,hold circuit, lock-in circuit,stick circuit, self-holding circuit翻译,hold circuit, lock-in circuit,stick circuit, self-holding circuit...

    0 条评论 59 2024-05-21 02:00

返回顶部小火箭