blast furnace mantle

精品项目网 2024-05-23 16:37:42

基本释义:

高炉炉身托圈

网络释义

1)blast furnace mantle,高炉炉身托圈

2)mantle ring,炉身托圈

3)blast furnace stack,高炉炉身

4)converter loop,转炉托圈

5)converter trunnion ring,转炉托圈

6)ring carriage of converter,转炉托圈

用法和例句

Feasibility research of ejecting converter-gas on blast furnace stack;

高炉炉身喷吹转炉煤气的可行性探讨

This paper expatiates the conceiving of ejecting converter-gas on blast furnace stack, analyzes and discusses feasibility in technology.

该文论述了转炉煤气喷入高炉炉身的设想,并分析探讨了工艺的可行性,经预测,直接经济效益显著,并有广阔的社会效益和推广前景,对冶金企业综合利用二次能源另辟了新径。

By using 3D non-linear FEM for the calculation of mechanical stress of 70 t converter loop in different angles,the results indicate that both the overall mechanical stress and displacement are lower and are the symmetrical distribution obviously.

应用三维非线性有限元法,对70 t转炉托圈在炉体倾斜不同角度时,进行了机械应力计算,计算结果表明托圈整体应力水平较低,但是在刚度变化大的局部产生了明显的应力集中,分析结果为转炉托圈的优化设计提供了可靠的依据。

Converter loop is a heavy dimensional structure with complicated welded parts.

转炉托圈是一个重型的复杂空间焊接结构,在使用中承受机械载荷以及长期温度载荷。

The converter loop is a key component to the converter,which is endured complicated mechanical and thermal stress at work.

针对某钢厂转炉托圈产生的裂纹,对托圈所受应力进行三维非线性有限元分析,计算结果表明,温度应力是裂纹产生的主要原因。

Fitting up and welding technology of steelmaking converter trunnion ring;

介绍了酒钢炼钢厂50t转炉托圈的组对及焊接,采取新颖的组对方法,使同轴度误差在控制范围内;采取合适的焊缝布置及探伤方法,确保转炉托圈组对后达到了使用标准,延长了其使用寿命。

Analysis on finite element of temperature field and revamp on ribbed slab of ring carriage of converter;

转炉托圈温度场有限元分析及内筋板结构改造

The basic structure and features of ring carriage of converter are analyzed.

分析了转炉托圈的基本结构和特点,着重对整体式大型转炉托圈的机械加工工艺进行了技术攻关,为大型转炉托圈采用整体式结构,以提高刚性和承载能力奠定了基础,并获得成功。

OPTIMIZATION DESIGN OF RIGID FRAMES FOR THE SHAFT AND TOP OF A 3 200 m~3 BLAST FURNACE IN LIAN STEEL COMPANY

涟钢3200m~3高炉炉身、炉顶刚架优化设计

PRACTICE OF GUNNING LINING MAKING IN THE UPPER PART AND THROAT OF4#BLAST FURNACE OF HAN STEEL

邯钢4#高炉炉身上部及炉喉喷补造衬实践

Effect of Different Shaft Structure Designs on Gas Distribution in Baosteel's Blast Furnaces

宝钢高炉炉身设计结构差异对煤气流分布影响

blast-furnace cinder

高炉矿渣, 鼓风炉炉渣

Used for injection between cooling walls and furnace shell.

用于大中型高炉炉体冷却壁与炉壳之间的压入灌浆,常用于炉身下部。

mixed coke oven and blast furnace gas

焦炉与高炉混合煤气

blast furnace tear down apparatus

高炉旧炉衬拆除设备

Used for lining in blast furnaces, hot air stoves, coke ovens and other industry furnaces.

用于各种工业炉窑的耐火内衬,如高炉、风炉、热炉、热炉、炉等。

Used for lining in blast furnaces ,hot air stoves ,coke ovens and other industry furnaces.

用于各种工业炉窑的耐火内衬,如高炉、热风炉、加热炉、均热炉、锅炉等。

boiler body or base [for steam or other vapors generating boilers or for superheated water boilers]

锅炉身或炉基[蒸汽锅炉或其他蒸气发生锅炉用或过热水锅炉用]

The Bessemer Process uses a furnace called a "converter".

酸性转炉法使用称为“转炉”的高炉。

PRACTICE OF SHI STEEL IN BLAST FURNACE PRODUCTION-STOPING AND REPRODUCING WITH FULL COKE

石钢高炉停炉及全焦开炉的探索实践

Pratice of Blow-in for Xuangang No.7 BF

宣钢7号高炉大修停炉开炉达产操作

Maintenance Practice at the Later Stage of Campaign of Masteel's 2500~3 BF

马钢2500m~3高炉炉役后期护炉实践

Long-team Banking and Raking out Practice of Taisan Steel's No.1 BF

泰钢1~#高炉长期封炉及扒炉实践

Practice of Cooling and Heating up No.10 Stove Relining

五号高炉10#热风炉在线中修凉炉、烘炉实践

Carbon ramming material is used on the spacer,the bottom of blast furnace and some other parts of the blast furnace.

高炉炉底垫层、炉底和炉缸环行碳块与炉壳间的间隙,炉底水冷管以上到炉底钢板。

d hopper arrangement

(高炉的) 钟斗装置

下一篇:没有了
上一篇:alloyed scrap
精彩图文
相关推荐
  1. wiry pulse

    精品项目网为您提供弦脉wiry pulse是什么意思,wiry pulse翻译,wiry pulse例句,wiry pulse用法等有关,wiry pulse单词知识大全供您查询使用!...

    0 条评论 59 2024-05-19 20:33

  2. natural power

    精品项目网为您提供自然功率(线路的)natural power是什么意思,natural power翻译,natural power例句,natural power用法等有关,natural power单词知识大全供您查询使用!...

    0 条评论 59 2024-05-21 02:45

返回顶部小火箭